TC50
For leading lines
T-Series organisers lead multiple lines back from the mast to banks of powerclutches
from £185,33 inc. VAT
Images
- TC50 organisers are specially developed for higher loads
- Minimal overall length
- Efficient bearings surface reduces winch effort and increases halyard life
- Integral end fairings for safe side loading
- Double stack versions available
- Can be used as an Aft Organiser to divert lines from a clutch to a winch
TC50/D - 50mm (2") alloy
TC50/D - 1000kg (2200lbs) upper row
TC50/D - 1500kg (3300lbs) lower row
TC50/D - Number of sheaves x 500kg (1100lbs) upper row
TC50/D - Number of sheaves x750kg (1650lbs) lower row
TC50/D - Up to 14mm (9/16")
add 130g (4.6oz) per extra sheave
add 215g (7.5oz) per extra pair of sheaves
Documents
-
TC50 Organiser Installation
Spinlock TC50 Organiser Installation
-
TC50 Drill Guides
TC50 (2D) PDF
Choose your TC50
- Number of sheaves
-
- Variant
-
TC50/3
50mm, 3 Sheave Symmetric High Load Deck Organiser
✓ Available
TC50/6Y
50mm, 6 Sheave Asymmetric High Load Deck Organiser
✓ Available
TC50/2Y
50mm, 2 Sheave Asymmetric High Load Deck Organiser
✓ Available
TC50/4
50mm, 4 Sheave Symmetric High Load Deck Organiser
✓ Available
TC50/5Y
50mm, 5 Sheave Asymmetric High Load Deck Organiser
✓ Available
TC50/6
50mm, 6 Sheave Symmetric High Load Deck Organiser
✓ Available
TC50/5
50mm, 5 Sheave Symmetric High Load Deck Organiser
✓ Available
TC50/4Y
50mm, 4 Sheave Asymmetric High Load Deck Organiser
✓ Available
TC50/2
50mm, 2 Sheave Symmetric High Load Deck Organiser
✓ Available
TC50/3Y
50mm, 3 Sheave Asymmetric High Load Deck Organiser
✓ Available